In February-March Justus Murangira and his team finished unit 1. They placed a plastic tank and builded a permanent tank to harvest water. At the same time water channels to drain water from unit 1 were constructed. Finally the wiring of the buildings of unit 1 was done.
 |
Construction of a permanent tank |
By doing so unit 1-classes and sanitation- is finished. We still have to connect to water and power. We're also making some adaptations at 1 toilet to secure accessability for wheelchair users.
 |
The construction of unit 1 is finished! |
Now that the buildings are finished we will concentrate on equipping these buildings.
For more pictures, go to the page Infrastructure.