Sunday, 28 January 2018

Infrastructure works

In October-November we worked on the water supply and on the finishing of the main building of unit 2, which houses the kitchen and the administration.

Rack for reservoir tank
At unit 1 a 'reservoir tank' of 3000 liters was placed on a rack. The toilets will now always have water, even at occasions no water is provided by National Water supply.
We now have a 5000 liter plastic tank that collects water from the sanitary building, a permanent tank of 10,000 liters connected to the roof of the classes and a reservoir tank of 3000 liters that is connected to the water pipe and with the permanent tank.

Justus tiling the bathroom
The finishing of the main building of unit 2 consisted of tiling the bathroom, installing gutters and painting the whole building with our 3 colors: broken white, army green and smokey gray.


Finishing main building unit 2
By Pele